中海国际社区B-2地块塔吊安装(拆卸)施工方案青建国际集团有限公司年月目录一、工程概况··········································1二、塔吊基础的选用····································1三、塔吊与建筑物立面图································1四、塔式起重机布置及塔机基础计算······················2五、塔式起重机布置····································2六、塔式起重机布置及塔机基础计算······················3七、塔基基础情况······································12八、稳定性计算书······································12九、机械设备的配备····································15十、施工准备:·········································15十一、安装工序········································16十二、安装后的调试····································20十三、安装(拆卸)过程中的安全注意事项················20十四、塔吊临近建筑物的安全防护·····················23塔式起重机安装(拆卸)方案一、工程概况本工程为中海地产
九曲片区B2地块二标段项目,位于济南市中区原九曲村旧址周边其北侧为二环南路,新建阳光新路西侧
本说明用于B2片区内各联排或双拼别墅
别墅地下一层,地上三层,建筑高度(±0
000至坡屋面起坡点)为9