武汉市大汉阳地区现代有轨电车试验线工程枫树桥现浇箱梁支架支撑体系安全专项施工方案编制:审核:复核:武汉市市政建设集团有限公司二0一六年三月目录一、编制依据..............................................4二、工程概况.............................................42.1工程基本概况........................................42.2箱梁支架典型断面图.................................10三、施工部署.............................................153.1进度计划...........................................153.2劳动力计划.........................................153.3物质设备计划.......................................16四、支架支撑体系施工方案.................................184.1.施工工艺流程.......................................184.2.地基处理...........................................184.3满堂支架搭设.......................................214.4满堂架上分配梁及外模背楞方木.......................234.5斜道搭设...........................................234.6.水袋预压施工流程...................................244.6.1支架验收.........................................244.6.2监测点设置.......................................244.6.3箱梁模板铺设及水袋布置...........................254.7水袋加载...........................................264.7.1荷载计算.........................................264.7.2水源连接.........................................274.7.3加载顺序.........................................274.7.4加载方法.........................................274.7.5卸载.............................................284.7.6数据整理.........................................284.8.支架拆除...........................................29五、质量保证措施.........................................305.1碗扣式钢管脚手架进场质量验收.......................305.2施工过程控制.......................................32六、安全文明施工保证措施.................................326.1安全组织保证措施...................................326.2危险源分析及防范措施...............................346.3外电防护措施.......................................366.4安全保证措施.......................................366.5文明环保施工保证措施...............................396.6消防措施...........................................416.7应急预案...........................................416.7.1应急领导小组.....................................416.7.2应急资源.........................................426.7.3应急响应.........................................43支架体系设计与验算书一、编制依据.............................................47二、结构布置.............................................472.1支架布置...........................................472.2分配梁布置.........................................482.3模板布置...........................................49三、计算荷载.............................................493.1荷载分析...........................................493.2荷载统计...........................................493.3荷载组合...........................................513.4材料参数...........................................51四、结构计算.............................................534.1满堂支架验算.......................................534.1.1验算内容.........................................534.1.2梁高按1.6m模板及分配梁验算.......................534.1.3梁高按1.6m的支架验算.............................58一、编制依据1.1武汉市大汉阳地区现代有轨电车试验线工程枫...