山西大同李家窑煤业有限责任公司兼并重组整合矿井副斜井架空乘人装置安装工程施工安全技术措施编制单位:河南煤炭建设集团有限责任公司2012年5月2日目录一、编制依据·································································二、工程概况·································································三、施工工期·································································四、目标策划·································································五、关键过程和特殊过程控制············································六、施工准备·································································七、施工方法·································································八、试运行····································································九、技术要求·································································十、质量保证措施与质量目标············································十一、重大危险源及应急预案············································十二、安全技术措施························································十二、环境保护措施························································十四、劳动保护用品的配置与发放······································十五、工程防护措施························································十六、成本控制措施························································十七、施工机具材料························································十八、劳力安排······························································十九、施工组织机构························································二十、安全组织机构························································二十一、环境控制组织机构图············································二十二、计划施工进度图表···············································山西大同李家窑煤业有限责任公司兼并重组整合矿井副斜井架空乘人装置安装工程施工安全技术措施一、编制依据:⑴甲方提供的施工图纸和其他技术文件等。⑵本公司“三标一体”管理体系以及其他相关管理制度。⑶本工程采用的主要规范、规程及标准:《煤矿安装工程质量检验评定标准》(MT5010—95)《机械设备安装工程施工及验收通用规范》(GB50231-...