目录一、编制依据及编制原则..................................................31、编制依据.............................................................32、编制原则.............................................................3二、工程概况............................................................3三、总体施工方案........................................................41桩基施工..............................................................42承台施工..............................................................43桥墩施工..............................................................44连续梁施工及挂篮的安全防护............................................4四、工期安排及配源配置..................................................41工期安排..............................................................42人员机械设备的组织措施................................................83临时工程布置..........................................................9五、主要工程项目的施工工艺............................................105.1、钢筋加工与安装...................................................105.2、桩基施工.........................................................105.3、承台施工.........................................................145.4、桥墩施工..........................................................155.5、连续梁施工........................................................17六、冬期施工方案.......................................................441、原材料的质量控制....................................................442、混凝土工程..........................................................453、混凝土的浇筑........................................................464、施工现场保温措施及混凝土养生........................................465、冬季钢筋加工技术要求及预应力张拉施工................................466、冬季施工的其它注意事项和防火措施....................................47七、夏季、雨季施工方案.................................................471、夏季施工方案........................................................472、雨季施工方案........................................................48八、施工技术保证措施...................................................491、施工技术措施........................................................492、质量技术措施........................................................523、工期保证措施........................................................534、环境保护技术措施....................................................54定坊特大桥(40+2×64+40)m连续箱梁施工方案一、编制依据及编制原则1、编制依据适用的铁道部颁布的规范和规定。国家、铁道部和地方政府(省、直辖市)的有关政策、法规和条例、规定;招标文件及承发包合同;铁道部现行高速铁路、客运专线技术标准,设计暂行规定,施工规范,验收标准和有关规定;《施工图设计文件》;现行铁路施工、材料、机具设备等定额;现场调查报告及放样核对资料、施工能力及类似工程施工工法、科技成果;国内外相关高速铁路的施工工艺及科研成果。2、编制原则2.1质量保证原则建立健全质量管理机构和质量保证体系,明确工程质量方针、目标、结合本工程的特征与实际情况采取切实可行的质量保证措施,进行施工过程管理与质量控制。2.2安全保证原则与交管、路政部门协作、成立联合值勤办公室,开展24小时路巡路查和值班制度,提高现场处治突发事件的能力,形成“统一指挥、快捷反应、整体行动”的机制。大力加强与安全保通工作的领导与协调,严格组织实施各项安全保通工作。按照公路路政部门要求设置行...