张江集镇4街坊3/2、3/7丘和3街坊3/3丘宗地块项目(一期)桩基工程施工方案北京城建四建设工程有限责任公司编制:审核:审批:目录一、工程概况·············································································3二、编制依据·············································································4三、施工条件·············································································4四、静力压桩机对周围环境环保的影响及防护措施·····························4五、施工方法·············································································61、施工准备·············································································62、施工放样·············································································73、沉桩顺序及工艺流程······························································84、沉桩质量控制·······································································9六、工程质量保证措施、质量认证体系·······