沣西新城应急给水厂深井泵房工程专项施工方案沣西新城应急给水厂项目深井泵房工程施工方案编制:审核:批准:日期:年月日沣西新城应急给水厂深井泵房工程专项施工方案目录第一章编制依据编制依据··············································1第二章工程概况第一节深井泵房施工概况······································1第四节电气自控施工概况······································2第三章项目经理部组成人员第一节项目经理部组织机构成人员·····························3第二节项目经理部机构组织···································4第三节项目经理部各级岗位职责·······························5第四节施工中平面布置图·····································6第四章劳动力、材料、机械设备投入计划第一节施工材料投入计划·····································7第二节劳动力安排计划·······································8第三节安全防护用品计划·····································8第四节检测仪器设备计划·····································9第五章施工方案第一节测量放线··············································9第二节基础施工·············································10第三节主体工程·············································13第四节装饰、装修工程········································23第五节屋面防水工程·········································26沣西新城应急给水厂深井泵房工程专项施工方案第六节脚手架工程···········································28第七节给排水及电气安装工程·································33第六章施工进度计划及工期保证措施第一节施工进度计划·········································35第二节工期保证措施·········································37第三节工程质量保证措施·····································43第四节冬期施工措施·········································47第五节安全施工措施·········································48第六节文明施工及环境保护措施·······························53沣西新城应急给水厂深井泵房工程专项施工方案0沣西新城应急给水厂深井泵房工程专项施工方案第一章编制依据编制依据:1、《建筑工程施工质量验收统一标准》GB50300-20132、《砌体工程施工质量验收规范》GB50203-20113、《混凝土结构工程施工质量验收规范》GB50204-20023、《砌体结构设计规范》GB50003-2001(2002年局部修订)4、《多孔砖砌体结构技术规范》JGJ137-2001(2002年局部修订)5、《建筑地基基础工程施工质量验收规范》GB50202-20026、《砌筑工程施工质量验收规范》GB50203-20147、《屋面工程施工质量验收规范》GB50207-20024、《工程测量规范》GB50026-935、《建施扣件式刚管脚手架安全技术规程及验收规范》JGJ128-20007、《砌筑砂浆配合比设计...