巴基斯坦拉合尔橙线项目一部轨道工程拌合站质量手册批准:审核:编制:巴基斯坦拉合尔橙线项目一部二O一六年九月目录一.项目介绍······················································4二.混凝土场所布置规划·········································5三、管理制度······················································61,设备管理·······················································61.1《机械操作管理制度》······································61.2《设备的定期维护保养制度》·····························71.3《2*120型混凝土搅拌楼操作规程》···················91.4《混凝土泵车操作规程》···································101.5《混凝土搅拌车操作规程》································111.6《装载机操作规程》·········································121.8附:主要机械设备一览表··································142,人员管理·······················································152.1《拌合站站长岗位职责》···································152.2《副站长岗位职责》·········································162.3《操作手岗位职责》·········································172.4《外籍员工岗位职责》······································182.5附:人员配备台帐》·········································193,质量管理》·····················································203.1《原材料质量管理制度》···································213.2《计量管理制度》············································223.3《搅拌管理制度》············································233.4《运输及浇注管理》··········································243.5《不合格品处理制度》·······································253.6附:混凝土质量控制流程图································264.,安全管理制度··················································304.1《安全预防措施》·············································304.2《安全生产管理规定》·······································34一.工程概况及拌合站职责项目名称:巴基斯坦拉合尔轨道交通橙线项目一部工程地点:巴基斯坦拉合尔市建设单位:PMA监理单位:CEC-NESPAK联营体设计单位:铁道第三勘测设计院集团有限公司现场混凝土拌合站主要负责机械及人员安全管理、质量管理、施工管理、资料管理等工作。负责混凝土、检验委托、材料保管、使用台账登记管理;负责机械保养、维护、使用管理;负责混凝土制作、运输、泵送等。依据混凝土规范,严格按照混凝土配...