沣西新城应急给水输水管道及深井泵房施工组织设计沣西新城应急给水厂项目输水管道及深井泵房工程施工组织设计编制:审核:批准:日期:年月日陕西有色建设有限公司沣西新城应急给水输水管道及深井泵房施工组织设计目录第一章编制依据编制依据···············································1第二章工程概况第一节工程简介···············································1第二节给水管道施工概况·······································1第三节深井泵房施工概况·······································2第四节电气自控施工概况·······································2第三章项目经理部组成人员第一节项目经理部组织机构成人员······························3第二节项目经理部机构组织····································3第三节项目经理部各级岗位职责································4第四节施工中平面布置图······································6第四章劳动力、材料、机械设备投入计划第一节施工机械设备投入计划··································7第二节施工材料投入计划······································8第三节施工进度计划··········································9第四节劳动力安排计划········································10第五节安全防护用品计划······································10第六节检测仪器设备计划······································11第五章施工方案第一节测量放线···············································11陕西有色建设有限公司沣西新城应急给水输水管道及深井泵房施工组织设计第二节土方工程···············································12第三节管道安装···············································15第四节管道过河段施工·········································16第五节管道接口···············································20第六节管道支墩···············································21第七节井室及深井泵房砌筑·····································22第八节管道水压试验···········································25第九节管道清洗、消毒·········································26第十节管道防腐···············································27第十一节管道回填··············································28第六章施工管理措施第一节质量保证措施··········································30第二节工期保证措施··········································31第三节安全保证措施···················...