金威建设集团有限公司**项目工程策划报告编制人审批人编制时间目录1金威建设集团有限公司1项目概况.............................................11.1项目位置及周边环境..........................................11.2项目概况....................................................21.3市政配套....................................................21.4地质状况....................................................32项目组织架构.........................................42.1组织架构....................................................42.2岗位职责....................................................52.3人员配置图..................................................53项目分期情况.........................................63.1项目分期情况................................................63.2销售卖场要求................................................64项目工程施工的重点和难点.............................74.1**工程施工工程量大、工期紧..................................74.2资金成本压力较大,项目开售要求前提..........................74.3销售卖场要求较高,对施工总平面布置影响较大..................84.4项目自身特点体现在工程施工方面的困难和难点。...............105平面管理............................................135.1办公区及生活区布置.........................................135.2临时水电及雨、污水排放设置.................................135.3土建总包单位分区...........................................145.4施工顺序安排...............................................155.5塔吊及人货梯布置...........................................195.6临时道路组织...............................................195.7土方开挖及基坑支护、桩基施工阶段平面布置...................205.8地库施工阶段平面布置.......................................215.9主体及装修施工阶段平面布置.................................225.10场内土方平衡............................................235.11脚手架搭设方式..........................................235.12场地降排水...............................................245.13一期与二期、四期之间的临时围闭..........................246进度管理............................................266.1总体进度控制目标...........................................266.2施工进度计划...............................................266.3施工控制的主要节点及目标...................................266.4常规工序控制时间要求及工序插入时间:.......................266.5关键工序的进度保证措施.....................................276.6进度控制措施...............................................302金威建设集团有限公司7质量管理............................................317.1质量管理目标...............................................317.2质量管理人员组织架构.......................................317.3质量管理职责...............................................317.4质量管理制度及保障措施.....................................328安全文明管理........................................358.1安全文明管理目标...........................................358.2安全文明管理架构...........................................358.3安全文明施工管理...........................................359项目综合协调管理....................................409.1项目的对内协调.............................................429.2项目的对外协调.............................................4310附件................................................433本项目广佛地铁海八路南海大道桂澜路金威建设集团有限公司1项...