第1页共77页编号:时间:2021年x月x日书山有路勤为径,学海无涯苦作舟页码:第1页共77页目录第一章、综合说明···································第二章、工程概况··································第三章、施工现场总体布置···························第四章、施工准备···································第一节、前期准备································第二节、测量放样································第五章、施工管理机构设置···················第2页共77页第1页共77页编号:时间:2021年x月x日书山有路勤为径,学海无涯苦作舟页码:第2页共77页········第六章、主要工序的施工方法·························第一节、土方开挖································第二节、土方填筑································第三节、砼工程施工······························第四节、井点降水施工方法··························第五节、护坡雨水沟及挡土墙的施工·················第七章、施工总进度及施工总进度表···················第八章、劳动力计划、主要施工机械需用量计第3页共77页第2页共77页编号:时间:2021年x月x日书山有路勤为径,学海无涯苦作舟页码:第3页共77页划········第一节、劳动力配备表·····························第二节、主要施工设备表··························第九章、确保施工技术保证措施·······················第一节、施工技术措施····························第二节、冬雨季施工措施··························第三节、降低工程成本措施························第十章、确保质量目标的技术保证措施·················第4页共77页第3页共77页编号:时间:2021年x月x日书山有路勤为径,学海无涯苦作舟页码:第4页共77页第一节、工程质量目标····························第二节、工程质量方针····························第三节、组织措施································第四节、技术措施·······························第五节、原材料质量保证措施······················第十一章、确保工期目标的技术组织措施···············第十二章、确保安全生产、文明施工的技术组织措施·······第一节、安全组织保证····························第5页共77页第4页共77页编号:时间:2021年x月x日书山有路勤为径,学海无涯苦作舟页码:第5页共77页第二节、安全技术措施····························第三节、环境保护································第四节、文明施工································第十三章、与当地村组及业主、设计方、监理方工作的协调措施····································第5页共77页第6页共77页编号:时间:2021年x月x日书山有路勤为径,学海无涯苦作舟页码:第6页共77页第一章、综合说明我公司为能参加禹州市颍河第三橡胶坝河道治理工程第七标段的投标而感到荣幸,同时也感谢禹州市颍河治理工程建设管理局给予我公司参与竞争的机会。通过认真...