第1页共40页编号:时间:2021年x月x日书山有路勤为径,学海无涯苦作舟页码:第1页共40页目录一、编制依据··········································2二、工程概况··········································2第2页共40页第1页共40页编号:时间:2021年x月x日书山有路勤为径,学海无涯苦作舟页码:第2页共40页三、工程重点及难点分析································3四、施工部署··········································3五、施工工艺流程······································5第3页共40页第2页共40页编号:时间:2021年x月x日书山有路勤为径,学海无涯苦作舟页码:第3页共40页六、施工准备··········································6七、施工方案的选择····································7八、主要施工方法······································10九、质量保证措施································第4页共40页第3页共40页编号:时间:2021年x月x日书山有路勤为径,学海无涯苦作舟页码:第4页共40页······24十、安全保证措施······································26十一、进度保证措施····································28十二、工程质量检验与验收······························28十三、基础工程检验批划分及试验检验····················29十四、成品保护措第5页共40页第4页共40页编号:时间:2021年x月x日书山有路勤为径,学海无涯苦作舟页码:第5页共40页施····································30一、编制依据(一)、万科河运校项目一期基础施工图。(二)、勘察院提供的《万科河运校项目一期地质详勘报告》为依据。(三)、万科河运校项目一期规划局提供的测量放线成果图。(四)、国家现行工程质量验收标准及施工验收规范。二、工程概况第6页共40页第5页共40页编号:时间:2021年x月x日书山有路勤为径,学海无涯苦作舟页码:第6页共40页(一)地质概况拟建场地平面上呈近似正方形,属剥蚀残丘斜坡地貌,原属重庆交通大学(大坪校区),场地现状东北部及中部水塘处地势低,标高约为305.5~309.0m;场地西南部及东南部地势较低,标高约为311.0m;场地北部及西部地势高,标高约为315.0~320.0m;整体地势高差约14.5m。(二)场地概况场地平基完成后形成两个台阶:北侧为-1层,平基标高313.7m,平基完成后大部分基岩裸露。南侧为-2层,平基标高310.4m,平基完成后大部分仍为土层覆盖,最大土层深度约8m。北、西、南三边形成4-6m边坡,且绝大部分为土质边坡。场地北侧为规划生活区、办公区用地,西侧为二期土石方平基施工场地。交通组织:南侧大石路有一入口。北侧及东北角新开两个入口。基本满足交通需求。(三)基础形式根据万科河运校项目一期总平面布置图及地质详勘报告,本项目分为三种基础形式:1、人工挖孔桩基础,一柱一桩,设地基梁。2、独立柱基基础,一柱一坑。3、挖孔桩基础中挡土墙采用地梁作基础。4、基础混凝土:垫层C15,护壁C25,桩、独立基础、地梁C30,DTLX第7页共40页第6页共40页编号:时间:2021年x月x日书山有路勤为径,学海无涯苦作舟页码:第7页共40页C40。5、基础土石方量约8000m3,混凝土量约7500m3三、工程重点及难点分析1)、本工程占地面积大(约3万平米),基础数量多(800多个),施工时间短(要求在60天内完成基础工程),施工组织管理及劳动力组织难度较大。2)、群体工程施工,各栋楼的轴线、标高控制是本工程管理的重点。3)、平基后周边存在4-6m高的土质边坡,对该边...