第1页共45页编号:时间:2021年x月x日书山有路勤为径,学海无涯苦作舟页码:第1页共45页目录一、基本内容...................................31.1方案特点...........................................31.2编制进度计划.......................................31.3施工程序...........................................31.4施工准备...........................................41.5与其它专业施工单位的协调配合.......................41.6安全文明施工控制程序..............................41.7冬季、雨季施工措施.................................61.8临时用电管理.......................................71.9施工方案的溯性修改.................................8二、施工工艺与技术措施...........................82.1.给排水专业........................................82.1.1施工内容...............................................................................82.1.2一般钢套管的制作和预埋...................................................92.1.3孔洞预留...............................................................................92.1.4预埋防水套管.....................................................................122.1.5管道预埋.............................................................................142.1.6管道支架预埋件.................................................................142.1.7.设备基础和消防箱洞口结构专业负责施工的尺寸的核定工作..............................................................................................14第2页共45页第1页共45页编号:时间:2021年x月x日书山有路勤为径,学海无涯苦作舟页码:第2页共45页2.2电气施工:........................................152.2.1预留预埋概况.....................................................................152.2.2准备工作.............................................................................152.2.3钢导管暗敷设.....................................................................162.2.4配电箱洞口预埋、电缆桥架穿楼板、墙洞预留:.........272.2.5电源进户线管、电话进户线套管预留:.........................272.2.6箱盒位置的确定和做法.....................................................282.2.7一些具体部位的做法.........................................................342.3通风空调与人防工程配合............................372.3.1通风人防套管加工:.........................................................372.3.2套管安装.............................................................................38三、安全文明施工措施.......................................................................413、1安全文明施工目标…………………………………………………………….....413、2安全文明施工保证体系统…………………………………………………….....413、3施工安全保证措施…………………………………………………………….....423、4施工安全保证措施…………………………………………………………….....443、5文明施工保证措施…………………………………………………………….....44四、成品保护措施4、1成品管理………………………………………………………………………....454、2成品保护措施…………………………………………………………………....46第3页共45页第2页共45页编号:时间:2021年x月x日书山有路勤为径,学海无涯苦作舟页码:第3页共45页一、基本内容1.1方案特点本工程为剪力墙结构,预留预埋主体配合阶段的施工是整个机电安装工程的关键工序,配合不好不仅影响土建施工进度与质量,而且也影响整个机电安装工程的后续工序的质量与进度,必须引起足够的重视。因此预留预埋主体配合阶段的施工显得尤为重要,要求更具科学合理性、...