巴基斯坦拉合尔橙线项目一部轨道工程拌合站质量手册批准:审核:编制:巴基斯坦拉合尔橙线项目一部二O一六年九月第0页共44页编号:时间:2021年x月x日书山有路勤为径,学海无涯苦作舟页码:第0页共44页目录一.项目介绍······················································4二.混凝土场所布置规划·········································5三、管理制度······················································61,设备管理·······················································61.1《机械操作管理制度》······································61.2《设备的定期维护保养制度》·····························71.3《2*120型混凝土搅拌楼操作规程》···················91.4《混凝土泵车操作规程》···································101.5《混凝土搅拌车操作规程》································111.6《装载机操作规程》·········································121.8附:主要机械设备一览表··································142,人员管理·······················································152.1《拌合站站长岗位职责》···································152.2《副站长岗位职责》·········································162.3《操作手岗位职责》·········································172.4《外籍员工岗位职责》······································182.5附:人员配备台帐》·········································193,质量管理》·····················································20第1页共44页第0页共44页编号:时间:2021年x月x日书山有路勤为径,学海无涯苦作舟页码:第1页共44页3.1《原材料质量管理制度》···································213.2《计量管理制度》············································223.3《搅拌管理制度》············································233.4《运输及浇注管理》··········································243.5《不合格品处理制度》·······································253.6附:混凝土质量控制流程图································264.,安全管理制度··················································304.1《安全预防措施》·············································304.2《安全生产管理规定》·······································34第2页共44页第1页共44页编号:时间:2021年x月x日书山有路勤为径,学海无涯苦作舟页码:第2页共44页一.工程概况及拌合站职责项目名称:巴基斯坦拉合尔轨道交通橙线项目一部工程地点:巴基斯坦拉合尔市建设单位:PMA监理单位:CEC-NESPAK...