真空预压(无砂垫层)排水固结法编制:审核:批准:连云港鑫途岩土工程有限公司二○一一年四月二十五日目录1施工方案初步设计第一章编制依据与编制原则一、编制依据·································5二、编织原则·································5第二章综合说明一、工程概况·································7二、工程特点·································7三、工程主要材料的性能指标及要求···············8四、主要施工工序的技术要求·····················10第三章施工总体部署一、项目管理、组织机构及各主要部门的职责·······112二、施工准备·································14第四章主要分项工程的施工方法一、施工测量·································21二、工程试验·································21三、施工监测与效果检验························21四、场地清理··································22五、塑料排水板施工····························22六、真空预压的施工····························253第五张技术组织措施一、施工技术与质量管理计划····················32二、质量管理点的设置计划······················32三、技术保证措施······························32第六章质量保证措施一、工程的质量目标····························36二、组织保证措施······························36三、制度保证措施······························37四、施工过程中的质量控制措施··················48第七章冬、雨季施工措施一、雨季施工措4施······························41第八章安全施工保证措施一、安全生产管理······························42二、安全生产控制措施··························46三、重大危险源辨识及评价······················49第九章环境保护措施一、环境保护的原则和目标······················51二、环境保护的管理组织机构····················51三、施工中的环境保护措施······················51四、主要环境因素的辨识及控制··················525第十章现场文明施工措施一、文明施工组织机构··························53二、文明施工措施······························53第十一章减少扰民、降低环境污染和噪音措施······································55第十二章地下管线及其他地上设施加固措施······································56第十三张施工现场维护措施······································576第一章编制依据与编制原则一、编制依据1、国家现行施工及相关的验收规范:a、《建筑地基处理技术规范》(JGJ79—2002)。b、《塑料排水板施工规程》(TJT/T256-96)。c、《塑料排水板质量检验标准》JTJ/T257-96。d、《真空预压法加固软土地基施工技术规程》(HG/T20578-95)。e、《港口工程地基规范》(JTJ250-98)。f、《港口工程质量检验评定标准》(含局部修订)JTJ221—98。g、《水运工程测量规范》JTJ...