目录一、施工方案及技术措施·····································1二、质量保证措施和创优计划································44三、施工总进度计划及保证措施·····························122四、施工安全措施计划·····································152五、文明施工措施计划·····································188六、施工场地治安保卫管理计划·····························252七、施工环保措施计划·····································261八、冬季和雨季施工方案···································266九、施工现场总平面布置···································291十、承包人自行施工范围内拟分包的非主体和非关键性工作·····292十一、成品保护和工程保修工作的管理措施和承诺·············292十二、任何可能的紧急情况的处理措施、预案以及抵抗风险(包括工程施工过程中可能遇到的各种风险)的措施·················331(1)安全施工专项方案·································331(2)消防安全专项方案·······························351十三、对总包管理的认识以及专业承包工程的配合、协调、管理、服务方案·············································380十四、与发包人、监理及设计人的配合·······················390十五、确保