××××××采暖设施施工组织设计×××××集团有限公司2011年07月18日目录1、编制依据及说明···································12、工程概况·········································13、施工组织管理·····································24、施工准备及管材、管件检验工作·····················705、主要施工方法·····································96、劳动力计划·······································157、主要施工机械计划·································168、确保工程质量的技术组织措施·······················169、确保安全施工的技术组织措施·······················2010、确保工期的技术措施······························2211、确保文明施工的技术措施··························2312、施工总进度表或工期网络图························2713、施工总平面布置图································271、编制依据及说明1
1编制依据(1)××××××采暖设施安装工程设计图纸;(2)《采暖通风与空气调节设计规范》(GB50019-2003)(3)《民用建筑热工设计规范》(GB50176-93)(4)《工业金属管道设计规范》(GB50316-2000)(5)《工业金属管道工程施工及验收规范》(GB50235-97)(6)《现场设施、工业管道焊接施工及验收规范》(GB50236-1