下载后可任意编辑 目 录 1 编制依据、原则及目的..................................11.1 编制依据..............................................11.2 编制原则..............................................11.3 编制目的..............................................12 工程概况..............................................22.1 工程简介.............................................22.2 主要设计技术标准......................................22.3 自然条件及工程环境...................................23 总体施工方案..........................................33.1 施工工艺及施工方法....................................43.2 支架施工..............................................43.3 模板施工..............................................83.4 支座安装.............................................103.5 钢筋施工.............................................113.6 预应力钢束安装.......................................123.7 砼浇灌施工...........................................143.8 砼养护...............................................163.9 支架监测.............................................163.10 预应力筋张拉........................................174 施工安全保证措施.....................................225 现场文明、环保组织保证措施...........................235.1 文明施工目标.........................................235.2 文明施工措施.........................................235.3 环境保护施工目标.....................................241下载后可任意编辑1 编制依据、原则及目的1.1 编制依据1、齐齐哈尔市劳动湖改造工程文化大街道路改造工程施工图设计资料;2、国家及地方有关工程建设的相关法律、法规及规定,现行的建设工程设计、施工法律规范、技术规程及质量验收评定标准等;3、施工现场踏勘所取得的有关工程地质、水文、气象、地材供应情况、交通运输状况,以及当地民风民俗、自然环境、水土资源状况等调查资料;4、在市政工程施工中积累的施工经验、科技成果、施工工艺、方法及可调配的施工人员、机械设备等资源情况;5、本标段招投标文件和《施工合同》及有关协议和补充文件; 6、城市桥梁工程施工与质量验收...