下载后可任意编辑目录一、编制依据..............................................2二、工程概况..............................................2三、防水施工重点及应对措施................................41、施工重点............................................42、应对措施............................................4四、施工准备..............................................41、组织准备............................................42、技术准备............................................53、材料准备............................................5五、施工工艺..............................................51、基层处理:..........................................52、一般细部附加处理:..................................53、大面防水层自粘卷材铺贴:............................54、附加层的设置........................................65、保护隔离层施工......................................66、后浇带防水施工......................................6六、质量保证措施..........................................7七、安全保障措施..........................................8八、成品保护措施..........................................9----------------------------精品 word 文档 值得下载 值得拥有---------------------------------------------------------------------------------------------------------------------------------------------------------------------------下载后可任意编辑一、编制依据《地下防水工程质量验收法律规范》GB50208-2024《地下工程防水技术法律规范》GB50108-2001《武汉市轨道交通 2 号线常青花园车辆段综合开发 C 区岩土工程勘察报告》勘报 1104-2多层和高层混凝土房屋结构抗震构造(03ZG003)地下室防水(05ZJ311)施工图纸及施工合同二、工程概况武汉市轨道交通 2 号线一期工程常青花园车辆段与综合基地位于汉口东西湖区常青花园住宅小区附近,与一期工程终点站金银潭站接轨。车辆段总用地面积约 41.16 公顷,上盖区域内共分三区域:B 区、C 区及 D 区。本标段施工范围为 C、D 区的上盖平台及盖下车辆段的全部土建工程。地下室防水:本工程按一级防水设计,地下室防水采纳钢筋混凝土自防水和卷材外防水满包,防水卷材采纳两米...