下载后可任意编辑老垃圾填埋场垂直防渗工艺比选老垃圾填埋场垂直防渗工艺比选 韩晓峰 摘要:对于一些前期未进行垂直防渗规划设计的老垃圾填埋场,在进行垂直防渗处理时垂直防渗施工工艺的正确选择是保证垂直防渗效果达到法律规范要求的关键一步。以哈尔滨市某未进行前期规划的老垃圾填埋场垂直防渗治理工程为例,通过对多种施工工艺在适应地层、施工效率、造价、施工质量、防渗效果等特点的分析比较,选择了适宜的施工工艺,也为今后类似工程提供了一定的借鉴作用。 Abstract: For some old landfill sites without vertical anti-seepage planning and design in the early stage , the correct selection of vertical anti-seepage construction technology is a key step to ensure that the vertical anti-seepage effect meets the standard requirements. Taking a vertical anti-seepage treatment project of an old waste landfill that has not been planned in Harbin as an example, through the analysis and comparison of the characteristics of various construction techniques , including adapting stratum , construction efficiency, cost, construction quality, anti-seepage effect, etc., the suitable construction technology is selected to provide a certain reference for similar projects in the future. 关键词:填埋场;垂直防渗;工艺比选 1 工程概况 哈尔滨市某垃圾堆肥处理场于 1991 年建场,1995 年封场,封场时仅对垃圾分层铺设填土然后分层碾压简易处理,未做垃圾渗滤液防渗系统,已出现渗滤液泄露情况,对周围土壤、空气、地表水、地下水和临近河道造成了污染。该垃圾填埋场垃圾平均埋深 11m,最大埋深为 30m,因此治理过程无法实现水平防1下载后可任意编辑渗治理,需采纳可靠的垂直防渗治理措施。 该垃圾场存在的主要问题:建设之初未做整体规划,未进行防渗设计,未实行防渗措施;垃圾填埋层厚度大,组成复杂,包括建筑垃圾、工业垃圾和生活垃圾,而且存在大量生活塑料袋,填埋层已经腐烂变质,呈黑臭状;对周围地层、水體及空气污染严重。 根据表 1 场地范围内各层岩土的渗透系数可知,第③、⑤层砂性土渗透性较强,为强透水层,厚度较大;第④、⑤ 2 层黏性土渗透...