CONJLWPCOwnerSQIB0101Construction executionplan review施工组织设计审查Contractspecification合同要求AI/RW/RRRW®Before commencement开工前Review record0102QA/QC Plan review质量计划审查Contractspecification合同要求AI/RW/RRRW®Before commencement开工前Review record0103Audit of constructionproposal专项方案审查Contractspecification合同要求AI/RW/RRSBefore commencement开工前Review record0104Design explanation设计交底Contractspecification合同要求AI/RW/RRIBefore commencement开工前Qualificationcertificates0105Joint review ofconstruction drawings施工图会审Contractspecification合同要求AI/RW/RRIBefore commencement开工前Review record0106Commencement report开工报告Contractspecification合同要求AI/RW/RRRBefore commencement开工前SH/T3503-J105A/B0201Checking Of ShopDrawings放样图审核By Drawing 图纸By Drawing 图纸AQRW/RW/R––By Drawing 图纸Drawing 图纸0202Check Welding ProcedureSpecifications( WPS)焊接施工工艺审核GB 50205-2001GB 50205-2001 Sec.5.2.1AQRW/RW/R––BY WPS 焊接工艺指导JGJ 81-20020203Witness WeldingProcedure QualificationTests( PQR) As Required焊接施工评定审核GB 50205-2001GB 50205-2001 Sec.5.2.3AT/QRW/RW/R––Each WPQR 焊接工艺规范JGJ 81-20020204WelderCertification/Qualification焊工证书GB50205-2001GB50205-2001 Sec.5.2.2AT/QRWW––Each Welder 每个焊工GJ1.6 Copy ofCertificate 证书复印件0205焊工进场考试Welder TestJGJ 18-2003JGJ 18-2003 Sec. 1.0.3AT/QRW/RW/REach Welder 每个焊工焊工操作证 Welder'certificater0206Verify Material TestCertificates-StructuralSections, Plate AndFasteners型材检测GB50205-2001GB50205-2001Sec.4.2.3/4.2.4/4.2.5AI/QRWW––By batch/Heat 每批Mill Test report 出厂测试报告GJ2.4.1GRADE( Note)验收等级INSPECTION FREQUENCY验收频率0100 开工前准备QUALITY RECORD /VERIFICATIONDOCUMENT 验收表格RESPONSIBILITY (Note) 职责INSPECTION AND TEST PLAN (ITP) FOR CONSTRUCTION 施工检测和验收项目表ITP NO.编号INSPECTION ACTIVITY验收项目APPLICABLEPROEDURE程序或者规范ACCEPTANCE CRITERIA 验收...