定额号项目名称单位合计工地运输人力运输YX1-1混凝土杆(kg)/500以内t.km132.26YX1-2混凝土杆(kg)/700以内t.km147.61YX1-3混凝土杆(kg)/1100以内t.km176.86YX1-4混凝土杆(kg)/1500以内t.km195.10YX1-5混凝土杆(kg)/1500以上t.km240.45YX1-6混凝土预制品(kg)/100以内t.km110.71YX1-7混凝土预制品(kg)/300以内t.km136.96YX1-8混凝土预制品(kg)/500以内t.km153.74YX1-9混凝土预制品(kg)/800以内t.km171.19YX1-10混凝土预制品(kg)/1000以内t.km202.26YX1-11混凝土预制品(kg)/1000以上t.km242.67YX1-12线材(kg)/400以内t.km142.13YX1-13线材(kg)/700以内t.km167.70YX1-14线材(kg)/1000以内t.km179.62YX1-15线材(kg)/2000以内t.km194.57YX1-16线材(kg)/2000以上t.km229.48YX1-17金具,绝缘子,零星钢材t.km99.01YX1-18超长合成绝缘子/交流750KV、直流500~660KVt.km141.93YX1-19超长合成绝缘子/交流1000KV、直流660KV以上t.km189.24YX1-20角钢塔材t.km119.01YX1-21钢管塔材t.km154.72YX1-22砂,石,石灰,水泥,砖,土,水,降阻剂t.km85.90拖拉机运输YX1-23混凝土预制品(kg)/100以内/装卸t11.99YX1-24混凝土预制品(kg)/100以内/运输t.km5.19YX1-25混凝土预制品(kg)/300以内/装卸t14.35YX1-26混凝土预制品(kg)/300以内/运输t.km5.41电力建设工程预算定额(2013年版) (输电线路工程)YX1-27混凝土预制品(kg)/500以内/装卸t17.51YX1-28混凝土预制品(kg)/500以内/运输t.km6.25YX1-29混凝土预制品(kg)/800以内/装卸t23.29YX1-30混凝土预制品(kg)/800以内/运输t.km7.33YX1-31混凝土预制品(kg)/1000以内/装卸t29.33YX1-32混凝土预制品(kg)/1000以内/运输t.km8.04YX1-33线材(kg)/400以内/装卸t12.55YX1-34线材(kg)/400以内/运输t.km7.38YX1-35线材(kg)/700以内/装卸t17.34YX1-36线材(kg)/700以内/运输t.km8.47YX1-37线材(kg)/1000以内/装卸t23.72YX1-38线材(kg)/1000以内/运输t.km9.46YX1-39金具,绝缘子,零星钢材/装卸t22.07YX1-40金具,绝缘子,零星钢材/运输t.km5.10YX1-41角钢塔材/装卸t15.59YX1-42角钢塔材/运输t.km5.20YX1-43钢管塔材/装卸t20.23YX1-44钢管塔材/运输t.km6.57YX1-45砂,石,水泥,石灰,土,水,降阻剂/装卸t10.27YX1-46砂,石,水泥,石灰,土,水,降阻剂/运输t.km4.93汽车运输YX1-47混凝土杆(kg)/500以内/装卸t44.18YX1-48混凝土杆(kg)/500以内/运输t.km1.34YX1-49混凝土杆(kg)/700以内/装卸t66.06YX1-50混凝土杆(kg)/700以内/运输t.km1.34YX1-51混凝土杆(kg)/110...