四川大渡河沙湾水电站尾水渠项目工程监 理 规 划 四 川 大 桥 水 电 咨 询 监 理 有 限 责 任 公 司四川大渡河沙湾水电站尾水渠项目工程监理部2025 年 11 月审核:陈道和审查:毕 晋编写:毕 晋 兰红才目 录1 工程概况1.1 工程所在位置及基本概况·········································11.2 气象、水文·····················································41.3 基本地质条件···················································102 监理范围及内容2.1 监理范围························································162.2 监理内容························································173 监理机构应向发包人提供的信息和文件4 监理 目标控制4.1 监理工作依据····················································204.2 主要监理目标····················································215 工程项目监理措施5.1 进度控制措施···················································235.2 质量控制措施····················································235.3 施工场地试验························································385.4 投资控制措施····················································395.5 合同管理························································395.6 信息管理························································405.7 咨询································...