目录第1章、工程总说明···························································································31.1编制说明······································································································31.2编制依据······································································································31.3工程概况······································································································41.4工程特点······································································································5第2章、总体施工组织布置··················································································72.1组建精干务实的项目经理部··············································································72.2施工前期准备工作·························································································132.3施工现场布置·······························································································14第3章施工进度安排及工期保证措施·····································································193.1计划工期·····································································································193.2施工区段划分和工期安排················································································193.3初步施工进度计划························································································193.4工期保证措施·······························································································19第4章施工方案、技术措施、施工工艺和方法·························································234.1管道工程施工工艺流程···················································································234.2主要分项工程的施工方法····································································...