第1页共79页编号:时间:2021年x月x日书山有路勤为径,学海无涯苦作舟页码:第1页共79页年产万吨冯金平炒货建设项目钢结构厂房施工组织施工方案目录第一章土建部分主要施工方案一、测量放线及沉降观测·······························3二、基础工程········································3三、主体砖砌体工程··································11四、厂房外地面工程··································11五、装饰工程········································12第二章钢结构施工方案一、材料管理第2页共79页第1页共79页编号:时间:2021年x月x日书山有路勤为径,学海无涯苦作舟页码:第2页共79页······································13二、H型钢构件制造·································19三、钢屋架、托架制作································25四、钢构件运输······································29五、钢结构吊装······································30六、屋面、墙面压型彩板安装····························42第三章电气安装施工方案一、主要项目施工流程································49二、主要分项工程施工方法·························第3页共79页第2页共79页编号:时间:2021年x月x日书山有路勤为径,学海无涯苦作舟页码:第3页共79页····49第四章消防管道安装施工方案一、主要项目施工流程································56二、主要分项工程施工方法·····························56第五章给排水安装施工方案一、工艺流程·······································59二、洁具安装材料要求································63三、操作工艺·······································63四、成品保第4页共79页第3页共79页编号:时间:2021年x月x日书山有路勤为径,学海无涯苦作舟页码:第4页共79页护········································64五、应注意的质量问题································64第5页共79页第4页共79页编号:时间:2021年x月x日书山有路勤为径,学海无涯苦作舟页码:第5页共79页第一章土建部分主要施工方案一、测量放线及沉降观测该工程采用DS3水准仪控制水平标高;采用电子全站仪和DJ2电子经纬仪控制轴线及垂直度。依据总平面图、现场实地及建筑施工图进行测量放线,将主要控制轴线用经纬仪投测至邻近建筑外墙、围墙或挡土墙上,做为轴线控制点,经纬仪的转角误差应满足90°±2″及180°±4″的要求,测距误差不超过±2mm。(一)平面控制:1.放线完成后,整理出放线测量成果图,经监理工程师、DFD代表验收复测无误后进入下道工序。2.轴线用经纬仪控制,将经纬仪安置在轴线控制桩上。(二)主体结构垂直控制车间钢柱安装的垂直控制,采用DJ2电子经纬仪校验,钢柱全高垂直偏差不超过h/1000。(三)建筑物标高的传递第6页共79页第5页共79页编号:时间:2021年x月x日书山有路勤为径,学海无涯苦作舟页码:第6页共79页施工措施:选用经校验的DS3水准仪一台,由规划部门指定基点引测到现场,用经校验的双面塔尺,辅以符合国家量值传递的30m钢卷尺进行标高传递。二、基础工程(一)工程施工准备质量保证措施1)开工后对现场施工人员进行培训,使各工种作业人员对工程的基本情况和岗位职责...