目录第一章编制说明··························31.1编制说明···························31.2编制依据···························3第二章工程概况··························62.1工程总体概述·························62.2各系统简介··························62.3主要工程量···························72.4本工程的特点、难点分析····················14第三章施工总体策划及部署····················163.1施工总体策划·························163.2项目管理的目标························173.3施工组织机构及管理职责····················173.4时间部署···························243.5施工段划分··························263.6施工准备···························26第四章过渡方案及风险分析····················394.1地铁1、2号线改造过渡方案··················394.2过渡方案的风险分析及应对措施·················57第五章主要施工方法及技术措施··················605.1电缆敷设施工方法·······················605.2变配电所施工方法·······················695.3综合监控系统改造施工·····················855.4牵引网工程施工方法······················885.5750V直流电缆的敷设及电缆终端的制作··············915.6杂散电流防护系统安装·····················925.7试验及调试··························95第六章与监理、设计及其他专业承包人的配合措施··········1296.1与供电局接口的划分及配合··················1296.2与轨道施工接口的划分及配合·················1296.3与通讯施工接口的划分及配合·················1296.4供电系统相关各专业之间的配合················1306.5与供货厂商之间的配合····················1306.6与设计单位之间的配合····················1306.7与业主、施工监理单位之间的配合···············131第七章质量保证措施及创优计划··················1327.1质量目标··························1327.2质量保证体系及组织机构···················1327.3创优工程体系及保证措施···················151第八章施工总体进度计划及保证措施················1638.1施工总工期控制目标·····················1638.2施工总进度计划·······················1638.3主要工期控制点·······················1638.4确保工程工期的各项保障措施·················164第九章安全防护及文明施工措施··················1719.1本工程安全文明施工条件概述·················1719.2安全保证体系及保证措施···················1719.3文明施工保证体系及保证措施·················1899.4施工机械和人员交通管理措施·················1919.5消防治安措施························1929.6环境保护措施························193第十...