大管棚预注浆超前支护技术在风霜岭隧道洞口施工中的应用杨斌(福建省漳州市漳龙高速公路有限公司,漳州市,36300)〖提要〗阐述了风霜岭隧道右洞进口堆积体段超前大管棚的施工,通过对监控量测结果进行分析,总结了超前预支护技术在通过软弱围岩时的作用
〖关键词〗隧道超前预支护堆积体施工效果评价ApplicationofRun-beforeProtectionbyPre-grountedBigTubeCanopyToFengshuanglingTunnelYangBin(ZhangzhouMunicipalZhanglongExpresswayCo
,Zhangzhou363000,China)Abstract:Elaboratingtheconstructionofpre-grountedbigtubecanopyinthepile-upbodysegmentofFengshuanglingTunnel
Throughanalysisonthemonitoredresults,itsumsupthefunctionsofrun-beforeprotectiontechnologyinpassingthroughweakrocks
Keywords:Tunnel,Run-beforeProtection,Pile-upbodyconstruction,Resultevaluation1工程简介漳龙高速公路漳州段风霜岭隧道全长862
5m,隧道设计为双洞四车道,单洞净宽9
75m,净高5m
右洞进口桩号YK34+495,设计标高89
隧道右洞进口段位于浅埋地段,埋深12~19m,为第四纪(Qc4)坡积层与强风化花岗闪长岩接触地带
表层为松散无粘性的砂状土,下伏强风化花岗闪长岩,岩石已风化呈土状,夹杂部分角砾碎石,结构松散,围岩自稳性极差,遇水易坍塌
隧道所处山体植被发育,