目录1工程概述..............................................................................01.1工程概况.....................................................................01.2施工平面布置.................................................................61.3施工要求及技术保证条件.......................................................72编制依据..............................................................................72.1编制目的.....................................................................72.2编制依据.....................................................................72.3编制原则.....................................................................83施工计划..............................................................................83.1施工进度计划.................................................................83.2材料计划.....................................................................83.3设备计划.....................................................................94施工工艺技术..........................................................................94.1旋喷桩结构...................................................................94.2旋喷桩施工...................................................................94.3技术要求...................................................................155、施工安全保证措施...................................................................165.2质量保证措施................................................................185.3关键工序质量保证措施........................................................195.4环境保护措施................................................................215.5应急预案....................................................................236劳动力资源配置计划...................................................................336.1人员配置计划................................................................336.2安全生产管理人员及特种作业人员配置情况......................................336.3特殊作业人员................................................................341工程概述1.1工程概况1.1.1风井旋喷桩工程概况龙桥路站~双凤桥站区间风井位于绕城高速接待寺立交桥东南侧的绿化带内,风井北侧距离绕城高速出口收费站约30米,东侧距离江安河约120米。风井为地下4层结构,总长17.6米,宽度22.8米,顶板覆土约3.92米,底板埋深约32.3米。采用明挖法施工,采用旋挖钻孔桩+内支撑的围护结构形式,采用基坑外管井降水。风井基坑与江安河之间设置旋喷桩止水帷幕。区间风井右线起终点里程YDK12+632.157~YDK12+649.757,左线起终点里程ZDK12+629.444~ZDK12+647.044,中心里程为YDK12+640.957(ZDK12+638.244)。区间风井位置图如图1.1.1所示。图1.1.1区间风井位置示意图为了阻止江安河水侵入风井影响基坑开挖,在风井向江安河方向10米位置设置旋喷桩,旋喷桩止水帷幕采用Φ600,咬合100mm的高压旋喷桩,旋喷桩进入基低以下6m,采用二重管法施工。高压旋喷桩主要材料为不低于42.5级普通硅酸盐水泥,可根据需要加入适量的速凝剂、悬浮剂等外加剂及掺和料,水灰比取0.9~1.1,水泥掺量取土的天然重度的25%~40%。区间风井平面图如图1.1.2。图1.1.2区间风井平面图1.1.2周边环境风井施工场地处于绿化带内,地上、地面、地下无管线,不影响施工。场地内有一条废弃的道路,不影响正常施工。1.1.3地质情况本段内容摘自《成都地铁3号线二、三期工程详细勘察阶段龙桥路站(原龙桥站)~双凤桥站(原金凤站)区间岩土工程勘察报告》结合本线路的工程地质剖面,每个岩土层分别按岩土层代号、岩土名、岩性描述如下:<1>填土层(Q4ml)<1-2>人工填...