贵溪南22kV变电站工程施工安全管理及风险控制方案编制单位:江西省火电建设公司贵溪南220kV变电站工程施工安全管理及风险控制方案编制单位(章):江西省火电建设公司编制时间:2013年03月01日贵溪南22kV变电站工程施工安全管理及风险控制方案编制单位:江西省火电建设公司批准(分管领导)年月日技术审核(技术部门)年月日安全审核(安全部门)年月日编写(项目总工)年月日目录1概述························1贵溪南22kV变电站工程施工安全管理及风险控制方案编制单位:江西省火电建设公司1.1编制目的······························································11.2编制依据······························································11.3工程概况······························································32安全目标························32.1安全管理目标·························································32.2环境保护及水土保持目标··········································32.3文明施工目标·························································43安全管理机构及职责···················43.1管理机构······························································43.2安全职责······························································54施工安全管理措施····················84.1作业人员基本条件··················································84.2安全管理制度和台帐···············································94.3专项施工方案······················································114.4施工机械管理······················································124.5安全费用管理······················································134.6作业人员行为管理················································134.7应急管理措施······················································145施工安全风险管理···················145.1施工安全风险管理措施··········································145.2重大施工安全风险控制措施····································155.2.1施工准备阶段··················································165.2.2土建施工阶段··················································185.2.3电气安装阶段··················································215.2.4试验调试阶段··················································22贵溪南22kV变电站工程施工安全...