中电投靖安仁首栎树20MW农光互补光伏发电项目安全专项方案报审表编号:JXSJ-A40-AQ-001工程名称中电投靖安仁首栎树20MW农光互补光伏发电项目致:湖南友源工程监理咨询科技有限公司靖安仁首光电监理部:现提出施工安全管理及风险控制方案审批。附件:施工安全管理及风险控制方案施工项目部(章)项目负责人:安全(技术)负责人:年月日项目监理部审查意见项目监理部(章)总监理工程师:专业监理工程师:安全监理工程师:年月日建设单位审查意见:管控部门负责人:安监部门负责人:专业工程师:安监专业工程师:年月日年月日本表一式四份,由承包商填报,建设单位二份、项目监理部,承包商各存一份。1中电投靖安仁首栎树20MWp农光互补光伏发电工程施工安全管理及风险控制方案编制单位(章):江西水电检修安装工程有限公司编制时间:2015年10月25日批准:年月日审核:年月日年月日2年月日编写:年月日年月日目录1概述·····························11.1编制目的························11.2编制依据························11.3工程概况························32安全目标·····························32.1安全管理目标························332.2环境保护及水土保持目标···················42.3文明施工目标························43安全管理机构及职责························43.1管理机构························43.2安全职责························54施工安全管理措施·························94.1作业人员基本条件····················94.2安全管理制度和台帐···················104.3专项施工方案······················114.4施工机械管理······················124.5安全费用管理······················134.6作业人员行为管理····················144.7应急管理措施······················145施工安全风险管理························155.1施工安全风险管理措施··················155.2重大施工安全风险控制措施················165.2.1施工准备阶段······················175.2.2电气安装阶段······················185.2.3试验调试阶段·····················206安全文明施工管理措施······················226.1施工准备阶段·······················226.2电气安装阶段·······················256.3试验调试阶段·······················277环境保护及水土保持措施·····················287.1防止大气污染······················287.2防止水土污染和水土保持·················2847.3防止噪声污染······················298分包安全管理··························309安全检查及隐患排查·······················3110信息管理····························3211安全管理评价··························32附件1.“施工供用电施工”安全风险预控措施···········34附件3.“构架吊装”安全风险预控措施··············3651概述1.1编制目的为规范和指导工程施工安全管理、文明施工及安全风险过程管控,明确各岗位职责,落实参建人员安全...