第1页共74页编号:时间:2021年x月x日书山有路勤为径,学海无涯苦作舟页码:第1页共74页目录一、组织设计编制说明及依据···························二、工程概况·········································三、总体部署和质量、工期、安全目标···················四、施工质量保证措施·································五、主要部位施工措施·································(一)土方工程······································(二)种植工程······································(三)养护工第2页共74页第1页共74页编号:时间:2021年x月x日书山有路勤为径,学海无涯苦作舟页码:第2页共74页程·····································(四)灰土垫层工程·································(五)铺装工程·····································(六)路缘石安装工程·······························六、安全、文明及环保施工措施························七、现场总平面布置图································八、工期计划、工期保证措施··························(一)工期计划·····································第3页共74页第2页共74页编号:时间:2021年x月x日书山有路勤为径,学海无涯苦作舟页码:第3页共74页(二)工期保证措施·································九、冬、雨季施工技术保证措施··························十、主要管理人员及劳动力安排··························十一、主要机具安排计划································十二、成品保护措施和工程保修工作的管理措施和承诺······十三、紧急情况的处理措施、预案以及抵抗风险的措施······十四、配合主管部门的工作······························一、编制说明及依据第4页共74页第3页共74页编号:时间:2021年x月x日书山有路勤为径,学海无涯苦作舟页码:第4页共74页(一)编制说明我公司根据工程特点及公司的施工能力和技术装备情况,与有关人员反复讨论,研究编制该工程技术方案。1、在编制过程中,对主要部位施工方法、工期计划、主要管理人员及劳动力按排计划、主要机具按排计划、保证工期、质量、安全和文明施工的主要措施作了详细的说明,其他的只做简要说明。2、方案中人员组织、机具投入及目标制定等是根据我公司的综合能力和现实状况确定的。(二)编制依据本施工组织设计方案依照以下文件为编制依据:1、招标文件中建设单位的意图和对工期、质量、进度等的要求,建设单位提供的环境设计图纸及工程量清单。2、《城市绿化工程施工及验收规范》。3、中华人民共和国国务院颁布的《城市绿化条例》。4、城市建设挡案记录规范。5、国家关于建筑工程施工安全操作规范。6、本公司施工技术操作规程。7、工程现场情况。二、工程概况工程名称:花溪人家安置房绿化工程(一)、建设规模及工程概况:绿化面积约7797平方米。第5页共74页第4页共74页编号:时间:2021年x月x日书山有路勤为径,学海无涯苦作舟页码:第5页共74页(二)、招标范围:设计施工蓝图内的土建及种植部分。(三)、现场条件:已具备施工条件。(四)、质量要求:符合工程施工质量验收标准。(五)、安全要求:执行国家建筑施工安全检查标准及安全技术规范,达到合格标准。(六)、工期要求:2018年5月10日开工,2018年10月20日竣工,...