目录一、编制依据..............................................................1二、工程概况..............................................................1三、专业工程特点..........................................................4四、技术标准..............................................................4相关既有线改建维持原线路技术标准。........................................5五、质量标准..............................................................5六、监理工作范围及重点....................................................86.1监理工作范围.......................................................86.2监理工作重点.......................................................8七、监理工作流程.........................................................107.1桥梁工程质量控制监理工作流程......................................107.2桥梁工程原材料、构配件及设备质量控制监理工作流程..................117.3桥梁隐蔽工程、分部分项工程质量控制监理工作流程....................127.4混凝土质量监理工作流程............................................137.5挂篮悬臂现浇箱梁施工工序、检测控制................................147.6桥梁工程工序质量控制监理工作流程..................................157.7质量缺陷处理流程..................................................16八、监理工作控制要点、目标及监控手段.....................................178.1监理控制要点......................................................178.2监理工作目标......................................................328.3监控手段..........................................................32九、监理工作方法及措施...................................................359.1监理工作方法......................................................359.2监理措施..........................................................38十、具体旁站部位和工序...................................................4310.1旁站具体部位及工序...............................................4310.2旁站监理人员的职责...............................................4310.3旁站监理的程序和方法.............................................43十一、挂篮施工安全监理要点...............................................45十二、危险源分析.........................................................45十三、危险源安全管理措施.................................................54一、重大危险源安全管理措施...........................................541.1临时用电不规范导致的触电事故..................................54二、一般危险源安全管理措施...........................................592.1吊装作业不规范导致的伤人事故..................................592.2因车辆驾驶不规范导致的伤人事故。..............................602.3预应力张拉、压浆施工安全措施..................................612.4现场围护结构设置及交通安全措施................................622.5挂篮使用安全措施..............................................621连续梁、连续刚构(含悬臂)工程监理实施细则一、编制依据1、四川铁科赤峰至喀左客运专线CFJL-1标监理站经批准的监理规划;2、新建赤峰至京沈高铁喀左站铁路工程设计图及相关文件;3、《高速铁路桥函工程施工质量验收标准》(TB10751-2010);4、《高速铁路桥涵工程施工技术工程》(Q/CR9603-2015);5、《铁路混凝土工程施工技术指南》(铁建设〔2010〕241号;6、《铁路混凝土工程施工质量验收标准》〔TB10424-2010〕7、《铁路预应力混泥土连续梁(刚构)悬臂梁浇筑施工技术指南》(TZ324-2010);8、《铁路建设工程监理规范》(TB10402-2007);9、《铁路桥涵工程施...