目录1.综合说明............................................51.1编制说明.........................................51.2编制依据.........................................51.3工程概况.........................................72.施工总体部署.......................................132.1工期总目标......................................132.2施工段划分......................................132.3总体施工目标....................................132.4施工现场平面布置................................132.5临时用地计划....................................142.6现场临时设施方案................................142.7项目组织机构....................................153.劳动力配置、材料计划和项目分包.....................213.1劳动力配置......................................213.2材料计划........................................213.3项目拟分包情况计划..............................234.主要施工机械设备投入计划...........................245.施工进度计划和保证措施.............................255.1施工进度计划....................................255.2进度保证措施....................................25-1-6.保证工程顺利实施采取的措施方案.....................306.1技术工艺的保障..................................306.2采用多区同时作业................................306.3合理安排施工工序,控制关键工序..................306.4抓好分项工程质量管理............................306.5合理资源配置的保障..............................317.主要施工方案与质量保证措施.........................327.1施工测量及质量保证措施..........................327.2排水工程及质量保证措施..........................357.3道路工程及质量保证措施..........................448.工程关键工序的施工技术、工艺以及质量保证的措施.....508.1排水管道基础施工................................508.2排水管道敷设....................................518.3沟槽回填........................................538.4路基土方施工....................................538.5石灰土施工......................................578.6质量保证措施....................................599.工程重点、难点分析和解决方案.......................649.1工程重点难点分析................................649.2解决方案........................................6410.基础排水和防止沉降措施.............................6610.1基础排水........................................66-2-10.2防止沉降措施....................................6611.地下管线、地上设施、周围建筑物保护措施.............6711.1管线保护措施....................................6711.2发生意外情况的处置措施..........................6912.施工工期安排.......................................7013.各工序的协调措施...................................7214.外部协调措施.......................................7315.冬、雨季施工措施...................................7415.1组织准备........................................7415.2技术准备........................................7415.3主要项目雨季施工措施............................7516.施工安全保证措施...................................7716.1建立项目职业健康安全管理体系....................7716.2职业健康安全方针................................7716.3职业健康安全目标................................7716.4职业健康安全体系................................7816.5职业健康安全职责................................7816.6职业健康安全教育与培训..........................8516.7职业健康安全管理体系培训........................8516.8现场安全活动.....................