********竣工资料(上册)工程名称:****建设单位:****施工单位:****时间:2012年04月26日目录一、中标通知书············································二、施工合同··············································三、施工管理机构证件······································四、施工组织设计方案······································五、开工报告、审批表······································六、整改通知书············································七、交工验收证书··········································八、单位(子单位)工程质量竣工验收记录···················九、工程材料入场纪录及检验批报告··························十、隐蔽工程验收记录······································十一、施工日记············································十二、竣工移交证书········································十三、公安、消防验收合格证································十四、竣工验收记录········································一、中标通知书二、施工合同三、施工管理机构证件四、施工组织设计方案施工组织设计(方案)报审表工程名称:****编号:致:****(建设单位)我方于已根据招标文件和施工合同的有关规定完成了中国邮政储蓄银行****施工组织设计(方案)的编制,并经我单位上级技术负责人审查批准,请予以审查附:施工组织设计(方案)施工单位(签章):****项目经理(签字):日期:建设单位审查意见:监理单位:日期:五、开工报告、审批表工程开工报审表工程名称:****编号:致:****(建设单位)我方承担的中国邮政储蓄银行****,已完成了以下各项工作,具备了开工条件,特此申请施工,请核查并签发开工指令。附:1、开工报告2、证明文件(详见施工组织设计)施工单位(签章):****项目经理(签字):日期:复查意见:建设单位:监理单位:日期:施工工程现场放线报验表表B2-2编号工程名称****日期致:中国邮政储蓄银行****(建设单位)我方已完成一层新砌砖墙和轻钢龙骨隔断、柜台及自助区的定位和地面、吊顶水平线的测量和放线,经自检合格,请予以检查。放线依据:根据甲方单位确认的施工图纸一层隔墙尺寸定位图P-04及结合施工现场的实际尺寸进行放线。施工放线人(签字):施工质检员(签字):技术负责人(签字):施工单位名称:****查验结果:经检查,符合施工图设计尺寸,达到《建筑、装修工程施工测量规程》精度要求。查验结论:合格纠错后重报监理工程师(签字):监理单位(名称):日期:年月日六、整改通知书七、交工验收证书八、单位(子单位)工程质量竣工验收记录接地装置分项工程质量验收记录表单位(子单位)工程名称****结构类型及层次框架一层分部(子分部)工程名称建筑电气工程检验批数1施工单位河南金也装饰工程有限公司项目经理****序号检验批名称及部位.区段施工单位检查评定结果监理(建设)单位验收结论1接地装置安装说明:检验结论项目专业技术负责人:日期:验收结论监理工程师:日期:接地装置安装工程检验批质量验收记录表GB50303-2002060109□□060206□□060608□□060701□□单位(子单位)工程名称****分部(子分部)工程名称接地装置安装验收部位接地装置施工单位****项目经理****分包单位无分包项目经理无施工执行标准名称及编号建筑电气工程施工质量验收规范GB50303-2002施工质量验收规范的规定施工单位检查评定记...