2015年天津市****热力有限公司****工程****热力站施工组织设计编制:审核:批准:**************工程集团有限公司年月日目录一、工程概况----------------------------------------二、施工技术与方案----------------------------------1,施工规范及验收依据·······································2,换热机组安装方案·········································3,泵类安装·················································4,水箱的制作与安装·········································5,管道及附件安装方案·······································6,阀门、压力仪表安装·······································7,配电柜安装···············································8,除锈防腐·················································9,试压·····················································10,保温····················································11,系统调试················································三、施工组织计划与措施------------------------------1,开工前需要做好的施工