下载后可任意编辑下载后可任意编辑CHANGE NOTES:An * next to the number or letter of a paragraph or sub-paragraph indicates a change from the previous issue.有*标记的表明同之前有更新PageChangeDate45G Amended07.05.202455Q Amended07.05.2024713 Cavity Venting - Additional Note19.09.2001922 Source and type of tool lubricant removed06.11.2024All pagesThe document has been extensively re-arranged. Individual Paragraphs have asterisked where text changes have been made12.03.2024All pagesExtensively rearranged. Individual paragraphs asterisked where text cahged05.03.20241,2Text added to expected tool life.30.03.20247,8,9Additions to page 6 changed page layout the following 3 pages 28.09.19996Additional points made09.12.19996‘B iv)’ added re: fountain tube.09.12.19999‘20’ moved ont page because of para. 13 update.23.02.20008Page contents change because of para. 13 update.23.02.20007‘13’ updated re: cavity venting.23.02.20005‘P’ added re: vent pins.23.02.20002‘E’ amended re: issue of updated drawings.23.02.200068biii amendmets.11.05.200045A point 3 changed22.08.20005Additional point Q 22.08.20003Amendment to Tooling Drawings29.08.200010Additional points20.09.20009Additional point20.09.20006 Sprue Bush Rad Altered 17.09.20246 Electrical Connector Details Added 29.9.2024下载后可任意编辑下载后可任意编辑GENERAL REQUIREMENTS FOR TOOL MANUFACTURE Page : 2 of 10基本要求INTRODUCTION这个说明是为了明确自责和质量要求These requirements have been compiled with the aim of regularising terms, conditions and tool construction. The aim is to enable us to obtain good quality bespoke tools having a high probability of satisfying the required duty. The individual points have been introduced gradually over a long period of time, as needs dictated. Should errors or possible improvements be se...