施工周期 construction period项目名称item name123456789 1011121轻钢龙骨基层basic level of light steel keel2轻钢龙骨封石膏板gypsum board sealing by light steelkeel3卫生间防水(含蓄水试验)toilet waterproof(imclude waterstoring experiment)4卫生间墙地砖toilet wall tile5吊顶龙骨基层(吊杆、龙骨)basic layer of ceilingkeel(suspender rod, keel)6吊顶封石膏板ceiling gypsum board sealing7地面找平ground horizontal8挡烟垂幕smoke resisting curtain9大理石干挂钢结构及其他钢结构marble cladding sturcture and othersteel structure10墙顶面腻子批嵌ceiling putty paving11门套基层basic layer of door frame12墙面饰面基层 basic layer of wall decoration项目施工进度表及人力配备PROJECT PROGRESS AND PERSONNEL ARRANGEMENT第一阶段(基础工作)first stage(basic work)序号No.月.月第二阶段second stage13墙面大理石wall marble14楼梯间、地下室地砖staircass, basement tile15钢天花吊顶steel ceiling16 墙顶面乳胶漆 ceiling emulsion17 防火玻璃fireproof glass18 玻璃隔断glass partition19 地面聚氨酯(第一阶段基础工作)ground polyurethane(basic work offirst stage)20橱柜制作(外加工)cabinet manufacturing(custom made)21吧台等现场制作基层site making basic layer of barcounter etc.22报告厅顶面装饰(含乳胶漆)auditorium ceilingdecoration(include emulsion)23大厅顶面装饰(含乳胶漆)lobby ceiling decoration(includeemulsion)24墙顶面腻子批嵌ceiling putty paving25 玻璃门安装 glass door installation26防火门安装(玻璃)fireproof door installation(glass)27不锈钢门套安装stainless door frame installation28 地面聚氨酯面层 ground polyurethane layer29墙面饰面装饰wall surface decoration30玻璃马赛克铺贴glass mosaic paving31地面大理石ground marble32柱子等铝板基层结构aluminium basic layer sturcture ofpole etc.33移动隔断安装movable partition installation34钢制防火门安装steel fireproof door installation35地毯铺贴carpet paving36亚麻地板fiberflax floor37其他地面材料other floor material38人造石铺贴、安装artificial stone paving...