施工组织设计(或方案)审批表单位工程名称施工组织设计(或方案)名称水语华庭安置房二期一标段工程建筑物临近高压线的安全保护措施施工组织设计(或方案)主要内容:1、工程概况;2、编制依据;3、安全保护方案;4、主要危险因素分析与防范;5、安全保证措施;6、监督检查
施工单位(公章):技术负责人:项目经理:年月日监理单位审查意见:监理单位(公章):总监理工程师:年月日建设单位审查意见:建设单位(公章):项目经理:年月日“水语华庭”危旧房拆迁安置房二期第一标段(5、9、10、11 号楼主体和部分地下车库、商业公建工程)建筑物临近高压线的保护方案北城致远集团有限公司水语华庭安置房二期项目部2013 年 5 月 8 日目录一、工程概况·················································1二、编制依据·················································1三、安全保护方案·············································2(一)10KV 高压线·············································2(二)35KV 高压线·············································3四、主要危险因素分析与防范····································4五、安全保证措施··············································5六、监督检查··················································8一、 工程概况:1、项目概况“水语华庭”危旧房拆迁安置房二期第一标段工程由 5、9、10、11 号