目录第一章编制说明................................................11.1编制依据..................................................1第二章工程概况................................................12.1工程概况..................................................12.2旋挖桩设计概况............................................22.3旋挖桩地质概况............................................32.4重点难点分析..............................................3第三章施工组织与部署..........................................43.1分项工程施工目标..........................................43.2旋挖分区..................................................53.3施工组织..................................................53.4旋挖施工顺序..............................................73.5施工准备..................................................7第四章进度计划................................................94.1进度目标..................................................94.2进度计划..................................................9第五章施工方法...............................................105.1施工流程.................................................105.2旋挖桩施工方法...........................................105.3终孔检验.................................................135.4清孔.....................................................145.5钢筋笼制作及吊装.........................................155.6声测管安装...............................................165.7混凝土灌注...............................................175.8桩身质量检测.............................................18第六章施工保障措施...........................................196.1工期保证措施.............................................196.2施工质量措施.............................................206.3施工安全措施.............................................246.4安全用电措施.............................................256.5应急措施.................................................266.6文明施工组织措施.........................................276.7环境保证措施.............................................276.8降低工程成本措施.........................................28第七章旋挖桩施工应急预案.....................................287.1塌孔.....................................................287.2缩孔.....................................................297.3卡埋钻具.................................................307.4掉钻.....................................................317.5断桩处理预案.............................................32第一章编制说明1.1编制依据1.1.1、施工图、地勘报告、现场踏勘、施工调查所获得的资料和信息。1.1.2、国家和地方现行有关设计、施工规范、规则、标准和定额等。1.1.2.1《建筑地基基础工程施工质量验收规范》(GB50202-2002)1.1.2.2《建筑桩基技术规范》(JGJ94-2008)1.1.2.3《施工现场临时用电安全技术规范》(JGJ46-2005)1.1.2.4《建筑施工安全检查标准》(JGJ59-2011)1.1.2.5《工程测量规范》(GB50026-2007)第二章工程概况2.1工程概况2.1.1项目概况本工程位于四川省,遂宁市西山路西侧,西藏.凯达实业有限公司投资建设、四川华达建设工程管理有限公司进行监理、北京世纪中天国际建筑有限公司设计、西藏凯达实业有限公司.遂宁分公司总承包工程项目本工程由2栋高层和4栋多层组成,其中1#楼为地下1层,地上16层框支剪力墙结构建筑,长度为40.8m,宽度为35.9m。-1层为地下停车场,层高为4.2m,1-4层为商业,5楼以上为住宅,层高为3m。总建筑面积约13000m2。2.1.2工程量、工期、劳动力、设备概况2.1....