铁路四电工程竣工文件编制指南中铁三局电务公司工程管理部2006年5月前言竣工文件是在建设项目建设过程中形成的,是反映工程过程和工程工作量的依据,是工程验收、质量评定的主要依据,是办理工程结算的重要组成部分,同时也是工程运行维护中的重要基础资料
编制竣工文件是工程技术管理工作的一项重要内容,针对我公司目前实际情况,工程管理部本着科学严谨、实事求是、服务基层的宗旨,认真编制了本指南,希望对施工现场的技术人员能够有所帮助
由于人员有限,编制时间仓促,编制过程中难免有错漏之处,请大家谅解,对使用中发现的问题,请及时反馈,以利修正,谢谢
二OO六年五月前言··················································································2第一章概述·······································································5一、竣工文件的编制依据························································5二、竣工文件的编写原则························································5三、竣工文件的编制要求························································6四、竣工文件的形成与积累·····················································6第二章竣工文件的组成与内容·················································8一、竣工文件应包括的基本内容有················