工程名称:番禺奥林匹克花园首期1#2#12#13#22#工程地点:沙湾镇陈涌村施工单位:梓业建筑工程公司201(黄振茂)施工队编制单位:201(黄振茂)项目部审批单位:技术负责人:肖洪潮审批负责人:编制人:黄树谦编制日期:2000年3月28日审批日期:年月日施工组织设计目录工程概述···················································8第一篇施工组织大纲施工组织设计或方案·······································9第1章工程总体部置·····································91.1总体控制原则······································91.2质量运行体系·······································91.3工程目标···········································91.4施工组织机构······································101.5施工准备··········································12第2章资源配置计划····································142.1主要施工机具需用计划·····························142.2现场临时给水·····································152.3主要材料需用计划表·······························152.4劳动力配置计划···································15第3章保证工期目标的主要措施和承诺···················163.1施工阶段划分·····································163.2各阶段质量控制计划································173.3施工作业流程·····································173.3.1现场准备阶段···································173.3.2主体结构工程阶段·······························183.3.3砖结构砌体工程阶段·····························193.4施工总体进度计划·································193.4.1工期日标及承诺··································193.4.2工期进度控制措施·······························19第4章主要施工方案及过程控制·······················214.1地下部分施工纲要································21A、桩基础施工·····································21B、承台及地梁施工································214.2地上部分施工纲要································224.2.1框架结构主体结构施工·························22(一)钢筋工程······································221、柱钢筋的安装································232、梁和板······································233、钢筋电渣压力焊连接工艺施工方法·············24(1)操作要点··································24(2)焊接参数·······················...