沣西新城应急给水厂项目深井泵房工程施工方案编制:审核:批准:日期:年月日目录第一章编制依据编制依据··············································1第二章工程概况第一节深井泵房施工概况······································1第四节电气自控施工概况······································2第三章项目经理部组成人员第一节项目经理部组织机构成人员·····························3第二节项目经理部机构组织···································4第三节项目经理部各级岗位职责·······························5第四节施工中平面布置图·····································6第四章劳动力、材料、机械设备投入计划第一节施工材料投入计划·····································7第二节劳动力安排计划·······································8第三节安全防护用品计划·····································8第四节检测仪器设备计划·····································9第五章施工方案第一节测量放线··············································9第二节基础施工·············································10第三节主体工程·············································13第四节装饰、装修工程···