国电吉林龙华延吉热电厂2×200MW机组新建工程目录1.编制依据.....................................................................11.1编制说明................................................................11.2编制依据................................................................11.3执行的规范及标准........................................................12.工程概况和工程量.............................................................12.1工程概况................................................................12.2主要工程量..............................................................23.施工项目的特点..............................................................34.施工平面布置及力能供应......................................................35.施工综合进度及各专业配合要求................................................36.施工作业准备工作及条件......................................................56.1作业人员的质量..........................................................56.2施工作业机械、工具、仪器、仪表的要求....................................66.3作业环境的要求..........................................................66.4作业物资供应的要求......................................................66.5主要物资及人力资源配备计划..............................................66.6施工技术准备的要求......................................................87.施工作业程序及作业方法......................................................87.1施工工序................................................................87.2基础轴线、标高的施测....................................................97.3基础垫层和基础换填施工..................................................97.4基础钢筋工程............................................................97.5基础模板工程...........................................................127.6混凝土工程.............................................................147.7锅炉钢架地脚螺栓施工...................................................157.8脚手架工程.............................................................178.质量标准和质量保证措施.....................................................178.1质量标准...............................................................178.2质量保证措施...........................................................19#2机组锅炉基础工程施工方案国电吉林龙华延吉热电厂2×200MW机组新建工程8.3质量验收控制流程......................................................219、施工过程中危险点的分析及安全文明施工措施...................................229.1施工过程中危险点.......................................................229.2安全文明施工措施.......................................................2410.职业安全健康和环境管理要求...............................................2511、危害辨识..................................................................2512、施工危险因素和环境因素辩识及控制对策表....................................30#2机组锅炉基础工程施工方案第1页共36页编号:时间:2021年x月x日书山有路勤为径,学海无涯苦作舟页码:第1页共36页1.编制依据1.1编制说明本施工方案是根据《火力发电厂工程施工组织设计导则》、《华国电吉林龙华延吉热电厂2×200MW机组新建工程》有关施工图纸文件、相关设计院标和国家现行技术法规、施工规范及验收标准编制的。1.2编制依据《火力发电工程施工组织设计导则》GCB-082-087《电力建设施工质量验收及评定规程》DL/T5210.1-2005《电力建设施工及验收技术...