目录第1章设备、人员动员周期和设备、人员、材料运到施工现场的.1第2章主要工程项目的施工方案、施工方法.....................................4第3章各分项工程的施工顺序.............................................................73.1土方工程..................................................................................73.2绿化种植..................................................................................83.3常年的绿化养护....................................................................173.3.1加强技术保证措施,具体做到“四勤、六防、一更换”173.3.2各月份的工作计划及安排..............................................173.4候车亭施工措施....................................................................25第4章质量保证措施...........................................................................274.1质量目标................................................................................274.2组织保证................................................................................274.3文件和资料控制....................................................................274.4物资采购质量控制................................................................284.5过程控制................................................................................284.5.1施工进度控制..................................................................284.5.2施工质量技术保证措施..................................................304.5.3施工质量控制方法..........................................................324.6检验....................................................................................354.7服务........................................................................................36第5章工期保证措施...........................................................................375.1工期目标................................................................................375.2组织保证措施........................................................................375.3材料供应保证........................................................................39第6章安全保证及文明施工措施.......................................................406.1安全保证措施........................................................................406.2文明施工方案........................................................................42第7章冬季和雨季施工安排...............................................................457.1雨季施工................................................................................45第8章质量、安全保证体系...............................................................46第9章廉政建设措施...........................................................................50第10章路面保护措施...........................................................................51第1章设备、人员动员周期和设备、人员、材料运到施工现场的1、技术准备熟悉图纸,明确施工任务,编制详细的施工方案,学习有关标准及施工规范。会同甲方摸清原有地下管线埋设情况,便于施工时采取保护措施,避免发生意外事故。做好各种原材料试验工作,并报监理方审批。施工前应对测量仪器和水准仪、经纬仪、钢尺进行校核。对建设单位所交付的各类桩号和挖制点进行检查复核。按照施工需要加密控制网,为保证控制网的可靠性,应做好保护桩。主控点(或其护桩)均应稳固可靠,保留至工程结束。为防止差错,对主控点等重要标志至少由二组相互检查核对,并作出测量和检查核对记录。测量采用盘左盘右...