××××××××××××工程加固分项工程施工组织设计编制:审核:审定:××××××××公司××××××项目部2018年5月10日目录第一章编制总纲.................................11.工程概况.......................................12.施工组织设计编制依据.....................1第二章现场管理机构...........................31.项目管理人员架构...........................32.项目管理人员职责...........................42.1项目经理职责............................42.2项目副经理职责............................42.3项目技术员职责...........................52.4项目施工员职责...........................52.5项目安全员职责...........................62.6项目质量员职责...........................62.7项目材料员职责...........................72.8项目资料员职责...........................7第三章工程进度计划...........................83.1总进度计划..................................83.2施工机械汇总..............................103.3施工安排....................................123.5.2梁柱碳纤维加固........................123.5.1柱外包钢加固...........................123.5.3梁体外预应力加固.....................133.5.4锚杆静压桩施工........................133.5.5植筋/化学锚栓施工...................143.5.6混凝土拆除..............................14第四章柱外包钢施工方案...................154.1材料..........................................154.1.1钢材要求.................................154.1.2胶粘剂质量检验及要求...............154.1.3化学锚栓要求...........................164.2柱外包角钢加固施工工艺...............164.3质量控制措施..............................174.3.1施工前品质检测........................174.3.2施工中质量控制措施..................184.3.3施工后品质检测........................204.3.4现场成品保护措施.....................204.3.5施工验收.................................214.4安全注意事项..............................21第五章碳纤维施工方案......................225.1碳纤维加固施工工艺.....................225.1.1施工准备.................................225.1.2基层表面处理及修复..................235.1.3材料准备.................................245.1.4涂刷底层树脂...........................245.1.5找平处理.................................255.1.6粘贴碳纤维片材........................255.2质量控制措施..............................275.2.1施工前品质检测........................275.2.2施工中质量控制........................285.2.3施工后品质检测........................295.2.4现场成品保护措施.....................305.2.5施工验收.................................305.3施工安全和注意事项.....................31第六章体外预应力施工方案................326.1材料............................................326.1.1主材.......................................326.1.2锚固系统.................................326.1.3混凝土....................................336.1.4锚固端、转角器........................336.2、机具设备..................................346.2.1张拉设备及机具........................346.3工艺流程及操作要点......................366.3.1锚固节点和转向节点的设计与加工制作................................................366.3.2锚固节点和转向节点的安装.........366.3.3体外预应力束的下料与安装.........376.3.4体外预应力束的张拉..................376.3.5体外预应力束与节点的防护.........386.4质量控制措施..............................386.4.1施工前品质检测........................386.4.2施工中质量控制措施..................406.4.3现场成品保护...