金晖家园机电安装工程(施工组织设计)投标单位:江苏建兴建工集团有限公司法定代表人:金晖家园机电安装工程施工组织设计(投标)编制日期:二OO五年元月八日目录1施工概况············································31.1结构概况···········································31.2专业概况···········································32施工准备···········································122.1施工管理网络······································122.2施工技术准备······································12江苏建兴建工集团有限公司1金晖家园机电安装工程施工组织设计(投标)2.3施工人员准备······································122.4施工机械设备及仪器准备····························132.5主要设备材料进场一览表····························153施工依据···········································194施工方案···········································224.1施工配合··········································224.2技术措施··········································264.3施工方江苏建兴建工集团有限公司2金晖家园机电安装工程施工组织设计(投标)案··········································294.3.1给排水方案······································294.3.2通风空调安装方案································434.3.3空调水系统施工方案······························544.3.4电气安装方案····································625质量通病预防·······································756成品保护措施·······································797工期保证措施··························江苏建兴建工集团有限公司3金晖家园机电安装工程施工组织设计(投标)·············828降低成本措施·······································839现场文明及环保保证措施·····························8510现场安全保证措施··································8611工程保修措施······································8712施工进度计划表··································89江苏建兴建工集团有限公司4金晖家园机电安装工程施工组织设计(投标)1、工程概况1.1结构概况金晖嘉园四期公建由北京金悦鑫房地产开发有限公司开发,北京东海富京国际建筑设计有限公司设计。位于海淀区西直门外小村33#,框架结构,总建筑面积51598m2。地上34998m2,地下16960m2,人防4896m2。地下三层,地上十一层,负一层为社区服务中心,负二层为车库,负三层为人防车库。地上部分南北两端为十一层写字楼,中间为七层写字楼。1.2机电概况江苏建兴建工集团有限公司5金晖家园机电安装工程施工组织设计(投标)1.2.1给排水安装工程给排水安装工程包括:生活给水系统、热水系统、中水给水系统、消火栓系统、自动喷洒系统、污废水排...