某塑料厂商业综合楼施工方案及进度计划编制目录第一章工程概况及施工特点分析···················01第一节工程建设概况····················01第二节建筑设计特点····················01第三节结构设计特点·····················第四节工程施工特点·····················第五节建设地点特征·····················第六节工程地质条件·····················第二章施工方案··························第一节施工程序·······················第二节施工流向·······················第三节施工顺序·······················第四节施工方法和施工机械··················第三章单位工程施工计划······················第一节确定施工过程·····················第二节计算工程量······················第三节单位工程施工安排···················第四章资源需要量计划·······················第一节劳动力需要量·····················第二节施工机械需要量····················第五章拟定施工措施························第一节技术组织措施·····················第二节安全措施·······················第三节文明施工·······················第四节成本管理及减低成本措施················第五节新技术的推广·····················参考文献·······························第1页共23页编号:时间:2021年x月x日书山有路勤为径,学海无涯苦作舟页码:第1页共23页第一章工程概况及施工特点分析(一)工程概况本工程为太原市某塑料厂商业综合楼,地处太原市旱西关街;建设单位为太原市某塑料厂,设计单位为太原市某建筑设计事务所,施工单位为太原市某建筑公司下属工程处,监理单位为太原市某建设监理公司。(二)建筑设计特点建筑总面积为9600㎡左右,平面形状为一字形,长78.75米,宽18米;建筑层数主体六层,局部七层;建筑层高为:首层高3.9m,标准层3.6m,七层3m;墙体采用加气混凝土砌块,入口门采用铝合金门,其他均采用实木门。底层设为商场,2~6层设办公室。在每层设楼梯两部,男女卫生间各两间,在每层两端各设小型会议室一间。(三)结构设计特点主体为现浇钢筋混凝土框架结构,现浇钢筋混凝土框架结构;本工程为太原某塑料厂商业综合楼,建筑高度为21.9m,属于多层商办建筑。故本建筑主要由底层商场及上部办公用房组成。根据规范要求:六层及六层以上办公建筑应设电梯。本工程主体为六层,故在建筑中部设两部电梯。由于规范要求办公室门洞口宽度不应小于1m,高度不应小于2m,故室内实木门选用洞口面积为1.1m×2.1m的带亮子实木门。采用现浇钢筋混凝土柱下十字交叉基础,基底埋深为1.8米,基底标高为-2.25米。框架梁截面尺寸为300mm×650mm,框架柱一、二层为650mm×650mm,三、四层为550mm×550mm,五~七层为450mm×450mm。(四)建设地点特征(1)地质条件:本工程位于山西省太原市。地势平坦,地下水位较低,现场的地下水水位于自然地面以下5m,土质为粘土。(2)建筑机械及设备情况:主要常见的各类建筑机械均可由施工单位提供。(3)建筑材料供应及运输工具和供运道路均可保证。施工地区有混凝土搅拌厂,距离建筑工地5公里,可采用混凝土搅拌车运输;施工地区有综合预制加工厂,距建筑工地5公里,可采用汽车运输。(4)现场供电条件:施工用电由城市电网接用,加设变电器,供电容量满足施工用电要求。(5)现场供水条件:采用城市供水管网,可供水量满足施工要求(6)劳...