第1页共12页编号:时间:2021年x月x日书山有路勤为径,学海无涯苦作舟页码:第1页共12页下川岛风电场风机设备登塔作业检修标准化作业指导书批准:____________________年_______月_______日审核:____________________年_______月_______日____________________年_______月_______日编写:____________________年_______月_______日作业负责人:张三作业时间:2012年03月04日08时30分至2012年03月04日12时00分下川岛风电场目录1工作任务·······································第1页第2页共12页第1页共12页编号:时间:2021年x月x日书山有路勤为径,学海无涯苦作舟页码:第2页共12页2作业准备阶段·································第1页2.1准备工作································第1页2.2召开班前会·····························第1页2.3填写并签发工作票····················第2页3作业阶段·······································第2页3.1开工·······································第2页3.2危险点分析及安全控制措施········第2页3.3作业流程及工艺标准·················第3页3.4竣工·······································第6页4结束阶段·······································第6页5附件·············································第6页5.1主要工器具·····························第6页5.2备品备件及材料·······················第7页5.3人员分工································第7页第3页共12页第2页共12页编号:时间:2021年x月x日书山有路勤为径,学海无涯苦作舟页码:第3页共12页1工作任务本作业指导书针对下川岛风电场登塔作业。2作业准备阶段2.1准备工作序号内容标准备注完成情况打“√”1现场调查掌握现场实际情况。√2技术准备安装报告及相关技术资料准备齐全。√3工器具准备开工前一次性准备完毕。见附件5.1√4备品备件及材料准备开工前一次性准备完毕。见附件5.2√5通知厂家及相关专业厂家派人进行技术指导,相关专业进行配合√2.2召开班前会(详见班组日志)序号内容标准备注完成情况打“√”1设备检修人员分工作业人员分工明确。见附件5.3√第4页共12页第3页共12页编号:时间:2021年x月x日书山有路勤为径,学海无涯苦作舟页码:第4页共12页2技术交底作业人员对交底内容清楚。√3危险点分析及控制措施危险点分析及控制措施详尽并有针对性。√2.3填写并签发工作票认真填写工作票,并经工作票签发人进行审核签发,保证工作票的正确。3作业阶段3.1开工序号内容完成情况打“√”1工作许可人同工作负责人到现场交代工作票及安全措施后办理工作许可手续,工作负责人负责检查安全措施。√2工作负责人带领工作班成员,列队宣读工作票,交代工作票内容及危险点,经作业班人员确定后在工作票中相应位置签名。√3核对设备名称及作业范围。√4根据现场实际情况及相关规定合理布置工器具、材料及吊装设备。√3.2危险点分析及安全控制措施序号危险点分析防范措施1人身触电将风机切换到服务模式,登塔前手动暂停风机2在地面控制柜下悬挂“禁止合闸,有人工作”警告牌第5页共12页第4页共12页编号:时间:2021年x月x日书山有路勤为径,学海无涯苦作舟页码:第5页共12页3不得随意触碰控制柜电气元件,未经许可,不得随意对开关进行操作,专人监督工作。4高空坠落检修人员不得少于两人,且情绪稳定,无身体不适5不得两人在同一段塔筒内同时登塔6登塔必须配戴劳动防护用品,戴安全帽,穿劳保鞋,带安全带,防坠落装置7高空坠物零配件与工器具若随身携带,应单独放在...