目录一、概述..................................................................1二、土石方开挖施工安全措施................................................11、一般地段土石方开挖施工安全措施............................................12、特殊地段(区)土方开挖施工安全措施........................................3(1)斜坡地段挖方..........................................................3(2)滑坡地段挖方..........................................................3(3)湿土地区挖方..........................................................33、施工排水..................................................................34、临时边坡的稳定............................................................45、土石方开挖机械防护措施....................................................47、运输安全措施..............................................................48、机械操作安全措施..........................................................4三、危险源监控与控制措施..................................................61、危险源的识别..............................................................62、危险源的评价..............................................................6四、危险源的综合预防......................................................71、对重大危险要采取“两个控制”..............................................72、加强安全生产的综合管理....................................................73、切实加强落实安全交底制度..................................................74、机械设备的进场验收........................................................75、所有高边坡的施工必须提前做好截水沟和排水沟。..............................76、加强施工现场用电管理......................................................87、常见事故防治措施..........................................................87.1基坑(槽)土方坍塌的预防措施............................................87.2高处坠落事故预防........................................................97.3施工现场积水问题处理措施...............................................10五、安全生产应急预案.....................................................121、安全生产预案涉及的主要事故类型...........................................122、应急报警机制.............................................................123、应急方案.................................................................12六、成品保护.............................................................15土石方开挖专项安全措施一、概述回龙山水电站工程土石方开挖总量约402.88×104m3,其中水工枢纽及导流建筑物土石方明挖304.19×104m3,施工工厂设施土石方明挖17.15×104m3,场内交通工程土石方明挖16.00×104m3。水工枢纽及导流建筑物、施工工厂及场内交通工程开挖料源主要为坡积的粘土或含碎石质粘土,阶地堆积的碎石质粘土夹少量砾石土,全强风化基岩及少量弱风化基岩。二、土石方开挖施工安全措施1、一般地段土石方开挖施工安全措施(1)基坑开挖时,多台机械开挖,挖掘机间距应大于10m;两人操作间距应大于2.5m。在挖掘机工作范围内,不许进行其他作业。挖土应由上而下,逐层进行,严禁先挖坡脚或逆坡挖土。(2)挖土方不得在危岩、孤石的下边或贴近未加固的危险建筑物的下面进行。(3)基坑开挖应严格按要求放坡。(4)机械多台阶同时开挖,应验算边坡稳定,挖掘机离边坡应有一定的安全距离。(5)在有支撑的基坑中使用机械挖土时,应防止碰坏支撑。(6)开挖前做好准备工作,防止地表水大量流入施工作业面,减少对边坡的冲刷和侵蚀,同时采取有效的排水措施,减少水下开挖。(7)高边坡施工时,仔细检...