中国浙江恒逸(文莱)PMB石油化工项目电站工程热力系统圆形煤场基础及挡煤墙施工方案编制:审核:批准:河南省第二建筑工程发展有限公司2017年08月10日1目录1、工程概况....................................................................41.1、工程概述:................................................................41.2、主要工程量:..............................................................41.3、工程特点:................................................................42、编制依据...................................................................43、开工前准备的条件和施工前的准备..............................................54、人员组织分工及要求..........................................................65、主要施工机械、工器具、材料及要求............................................76、施工进度计划及要求..........................................................87、施工工序、方法及要求........................................................87.1、施工工艺流程..............................................................87.2、基础降水施工..............................................................87.3、基础土方开挖.............................................................117.4、模板工程.................................................................127.5、钢筋工程.................................................................147.6、预埋件、预埋套管的加工和安装.............................................167.7、混凝土工程...............................................................167.8、脚手架工程...............................................................198、质量保证措施及质量标准.....................................................298.1、质量标准指标及验收要求...................................................298.2、强制性条文...............................................................318.3、质量通病防治:...........................................................338.4、成品防护措施.............................................................338.5、质量控制点...............................................................349、安全控制措施及要求.........................................................349.1一般安全注意事项..........................................................349.2、专项安全保证措施.........................................................359.3、混凝土施工安全注意事项...................................................359.4、主要应急措施.............................................................369.5、危险源识别及其控制措施..................................................38210、环境、文明、绿色施工措施及要求...........................................3910.1安全文明施工.............................................................3910.2绿色施工措施.............................................................3910.3重要环境因素及控制措施...................................................391、工程概况1.1、工程概述:3本工程为中国浙江恒逸(文莱)PMB石油化工项目电站工程,位于文莱大摩拉岛(PMB岛),本方案为中国浙江恒逸(文莱)PMB石油化工项目电站1标段圆煤场基础施工指导方案。圆煤场基础为混凝土结构环形基础,基础中心半径为50.65m,基础宽*高的尺寸为4.6m*2m。承台上有环梁居中布置,环梁宽度为1m。±0.000相当于绝对标高3.8m,基底标高为-2.8m,环梁上部顶标高为-0.2m。混凝土强度等级:垫层采用C15混凝土,其余采用C40。保护层厚度:承台底为100mm。侧、顶为50mm,短柱及梁为40mm...