目录一、编制依据、原则及范围.................................................................................11.编制依据........................................................................................................12.编制原则........................................................................................................13.编制范围........................................................................................................1二、工程概况.........................................................................................................1三、劳动力组织、设备及工器具.........................................................................1四、施工工期安排.................................................................................................2五、施工方法.........................................................................................................2六、施工步骤.........................................................................................................31.测量放线........................................................................................................32.凿毛................................................................................................................33.基底清理、冲洗............................................................................................44.钢筋绑扎........................................................................................................45.二衬侧壁泄水孔引出及排水管预埋............................................................56.接地端子设置及二衬预留接地钢筋接入....................................................57.过轨管设置....................................................................................................78.支立模板,混凝土施工..................................................................................7七、质量保证措施.................................................................................................9八、安全及环保要求...........................................................................................10隧道水沟电缆槽施工方案一、编制依据、原则及范围1.编制依据1《双线隧道复合式衬砌》(西成客专施隧参101)。2国家、铁道部现行技术标准、施工规范及工程质量检验评定标准。3国家、铁道部、地方政府有关安全、环境保护、水土保持的规定、规则、条例。2.编制原则1遵循专业化队伍施工和综合管理相结合的原则,充分发挥专业人员和专用设备的优势,采用综合管理,合理调配,科学安排各项施工程序,组织连续、均衡、紧凑有序地施工。2遵循新建铁路西安至江油段设计图的设计意图,确保施工质量。3.编制范围本施工方案适应于西成客专房家湾隧道水沟电缆槽施工。二、工程概况我工区承担施工任务为房家湾隧道进口(DgK283+911-DgK286+961),共计3050米,拟采用定型钢模板台车施工水沟电缆槽,模板台车每循环施工12米,2套模板双侧同时施工。三、劳动力组织、设备及工器具根据本工序的施工特点,结合各工种的技术水平及质量要求,施工作业人员如下表1表1水沟电缆槽施工劳力安排表工班名称人数担负主要施工任务钢筋工3钢筋绑扎混凝土工4模板安装、混凝土灌筑、拆模等一个水沟电缆槽工作面需要的主要机械设备配置表见表2表2主要机械、设备表序号名称规格型号数量1钢筋切割机12钢筋调直机13砼运输车14手持电钻25钢模板定型模板台车2套(12延米/套)6装载机118高压水枪19振动棒50/303/2四、施工工期安排我工区水沟电缆槽施工工期安排如下:每月施工300米(双侧)共计10.3个月:2015.4.01~2016.2.10五、施工方法水沟电缆槽施工采用...